Launch - Chandryaan 3 is scheduled to launch at 2:35pm on Friday. Its launch window however extends till July 19.
2xS200 Ignition - Rocket engines ignite at 0 seconds.
L110 Ignition - L110 engines ignite at 108 seconds.
2xS200 Separation - Two side boosters (2xS200) detach at 127 seconds.
PLF Separation - Payload fairing separates at 195 seconds.
L110 Separation - L110 engines separate at 306 seconds.
C25 Ignition - C25 engine ignites at 308 seconds.
C25 Shut-off - C25 engine shuts down at 954 seconds.
Satellite Separation - The satellite separates from the rocket at 969 seconds.
Voyage to the moon - The module will travel for about a month to reach the moon after it is launched.
Moon landing - The landing is planned for August 23-24, but this could change based on the moon's sunrise. If there's a delay, ISRO will reschedule the landing for September.